12 trays small home food dehydrator for fruit vegetable dryer household beef jerky drying machine banana dryer
Key attributes
Other attributes
Packaging and delivery
Lead time
Quantity (pieces) | 1 – 1 | 2 – 50 | > 50 |
Lead time (days) | 3 | 14 | To be negotiated |
Item NO.
|
ST-02
|
Product Dimension (W X D X H )
|
430X315X460mm
|
wooden case Dimension (W X D X H )
|
500X390X520mm
|
Rack Size(L X W)
|
290x290mm
|
Rack Grid Spacing
|
6mm
|
Rack Gap
|
30mm
|
Total Trays
|
12trays
|
N.W (KGS)
|
13kgs
|
G.W (KGS)
|
14kgs
|
Product Material
|
Food grade 304 stainless steel racks;
201 stainless steel housing, lifting handles, latches;
Tempered glass window door;Aluminum alloy door handle;
Control panel with PVC finish and touch screen
|
Power
|
800W
|
Voltage / Frequency
|
220V/50hz, 110V/60hz( MOQ:1X20GP, extra cost USD4/unit)
|
Temperature Ranges
|
20~90℃ (68~194℉)
|
Max. Timing
|
24hrs
|
Noise Level
|
50dB
|
Capacity
|
45L
|
Warranty
|
1 year warranty / Provide techinicial support according to specific issues; / Provide FOC vulnerable parts
|
Packages
|
EPE cushion
High strength corrugated carton
B/W printing manual
|
Notes
|
1. Other special requirement shall be added to related cost
2.MOQ: 20GP container, can mix models. Extra sample fee will pay back after a 20GP.
3. Lead Time: For first order 35 days, and the repeated order 30 days after all OEM artworks confirmed.
4. Payment Term: T/T 30% deposit, the balance shall be paid one week
before shipment.
5. Certs: CCC, CE, ROHS, LVD, EMC
|
Package |
Materials
|
PE bag / EPE cushion / High strength corrugated carton
|
Export carton dimensions
|
(W)500 X (H)340 X (D)370mm
(W)19.7 X (H)13.4 X (D)14.6″ |
|
Net weight
|
9kgs/ 19.8lbs
|
|
Gross weight
|
10kgs/ 22lbs
|
|
Case pak
|
1/1CTN
|
|
Loading quantity
|
20′ container
|
257pcs
|
40’HQ container
|
574pcs
|
ODM project process
2.factory quoting: quotation is passed by customer and factory provide die design.
3.making prototype: within 5-7days, provide the 1:1 mock-up
4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment
5.Opening mould. Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months
6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.
7.Trial production. Small mass production after passing the mould testing and do fully product test
8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.
9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.
Our company has perfect equipment and high-quality technical team, can customize products according to customer requirements.
Reviews
There are no reviews yet.